Tag Archives: THEVERYMANY

UPDATE

Columbia – Fall 2008 :

www.ncertainties2.wordpress.com

Die Angewandte (Vienna) – Cross over studio 2008 :

www.ncertainties3.worpdress.com

Kyuseon Hong_final presentation

Kyuseon Hong

Francois Roche Studio Fall 2007 at Columbia

update_kyuseon2.jpg

Jordan Trachtenberg_Final Review_12.07.07

jrt2105@columbia.edu

Situations of Materialization 

 After generations of conflict the Israeli wall has/is being built to minimize friction between Israelis and Palestinians. A total of 436 miles of wall is to be built dividing the peoples.

 The wall became a representation of the constant conflict of generations between the  Israelis and Palestinians. This large monotonous system has become a generalization of violence. But, along the wall there are extremes of situations, from hostile/violent to normal/peaceful.  I am interested in an extraction of these conditions, a materialization of these situations.

 

The Wall is a network, a connection rather then a division. Is has the potential to connect communities hundreds of miles away. With lack of water the wall can become an aqueduct, adding new infrastructure and establishing new potentials for communities to exist/thrive.

 

 This system is consistent and flexible. Ephemeral and permanent.  It has deformations that represent past conditions, current conditions and conditions yet to come. jordan-final01.jpg

jordan-final02.jpg 

As the wall dissolves over time the infrastructure acts as a suture, that leaves behind a new bind through infrastructure and remembrance of the situations before.

 

jrt2105@columbia.edu

071207_Agritect_Final

renderings_landscape.jpg

Click on the above image to view slides from final presentation…
Click here for the ‘final’ script which generated it…

john.cerone 07.11.28

multiples.jpg

robot_joint_diag-copy.jpg

Jordan Trachtenberg 11_28_07

j19.jpg

071128_Agritect_5.15

test_01_goodnormal.jpgtestb_01.jpg

test_02_goodnormal.jpgtestb_02.jpg

test_03_goodnormal.jpgtestb_03.jpg

test_04_goodnormal.jpgtestb_04.jpg

The alternatives…. The two versions are the same system, with the same parameters using a different lofting cross section.  The one on the left was from the most recent presentation.  The one on the right is updated, attempting to reveal the slabbed nature of the project.  Both have good qualities…  thoughts?